

Exclusive wall finishes & seamless floors.
Craftsmanship at master level.
MADE IN ITALY · 72 SURFACES
The techniques
How we work
On site or in the studio: we show real samples, not catalogues. Material, colour and texture are decided on the object itself.
1 appointmentThe invisible part of master work: substrates are checked, filled and primed — the base that lasts for decades.
1–3 daysLayer by layer, by hand. Every pass of the trowel lands — this is where the depth comes from that needs no explaining later.
2–7 daysProtection, polish, final inspection. You receive a surface that stays as it looked on day one — care instructions included.
1 day“You cannot see how many layers a wall carries.
Ilija Filipovic — founder, Wandmeister
But you feel it — every time you walk into the room.”
handmade — no prefabricated panels, no shortcuts
layers in a stucco marmo surface
and more: how long a properly sealed surface lasts
Contact
A first consultation with no obligation — on site, throughout German-speaking Switzerland.